| Positions of Professional and Support Staff of ITER Organization (2014.04〜2015.03) | ||||||||||
| Code | Title of Department, Office and Division | Job Code | Job Title | Job Grade | ||||||
| ODG | OFFICE OF THE DIRECTOR-GENERAL | |||||||||
| IO Strategic Planning | ||||||||||
| Communication & External Relations | ||||||||||
| Legal Affairs | ||||||||||
| ITER Council Secretariat | ODG-026 | Assistant ITER Council Secretary | P2 | |||||||
| Internal Audit Service | ||||||||||
| IO-DA Coordination | ODG-027 | IO-DA Coordination Officer | P2 | |||||||
| SQS | DEPARTMENT FOR SAFETY, QUALITY AND SECURITY | DS-001 | Director of Department for Safety | D1/D2 | ||||||
| Occupational Health & Security Coordination Division | ||||||||||
| Occupational Health & Safety | SQS-034 | Health and Safety Assistant | G3 | |||||||
| SQS-035 | Health and Safety Coordinating Assistant | G5 | ||||||||
| Physical Protection | SQS-036 | Administrative Security Assistant | G3 | |||||||
| Nuclear Safety & Analysis Division | SQS-029 | Nuclear Safety Engineer | P3 | |||||||
| Safety Analysis & Assessment Section | ||||||||||
| Safety Control Section | ||||||||||
| Quality Assurance Division | ||||||||||
| ADM | DEPARTMENT FOR ADMINISTRATION | |||||||||
| Directorate for General Administration | ||||||||||
| Human Resources Division | ||||||||||
| Talent & Competencies Development Section | ||||||||||
| Renumeration, Performance & Employment Section | ||||||||||
| Procurement and Contract Division | ||||||||||
| Procurement Core Tokamak, Controls & Site Section | ADM-128 | Cost Estimation Responsible Officer | P4 | |||||||
| ADM-128 | Cost Estimation Officer | P3 | ||||||||
| Procurement Installation, Plant & Support Section | ADM-008 | Procurement Responsible Officer | P4 | |||||||
| Document Control Section | ADM-125 | Librarian | G3 | |||||||
| TCWS-021 | Document Controller | G3 | ||||||||
| General Services Section | ||||||||||
| Directorate for Finance, Budget & Management Systems | ||||||||||
| Finance and Budget Division | ||||||||||
| Accounting, Treasury & Systems Section | ||||||||||
| Budget Management Section | FBM-102 | Financial Analyst Officer | G6 | |||||||
| FBM-133 | Budget Officer (PSE) | G5 | ||||||||
| Financial Control Section | ||||||||||
| System Management Section | ||||||||||
| Project Information System Section | ||||||||||
| DIP | DEPARTMENT FOR ITER PROJECT | |||||||||
| Configuration Control Division | ||||||||||
| POP | Directorate for Plasma Operation | |||||||||
| Science Division | ||||||||||
| Confinement & Modelling Section | ||||||||||
| Stability and Control Section | ||||||||||
| Tungsten Divertor & Plasma-Wall Interactions Section | ||||||||||
| Technology Division | ||||||||||
| Test Blanket Modules Section | ||||||||||
| CHD | Directorate for CODAC, Heating & Diagnostics | |||||||||
| Control System Division | CHD-061 | Secretary | G2 | |||||||
| CODAC Section | ||||||||||
| Plant Control & Instrumentation Section | CHD-081 | Plant Control & Instrumentation Section Leader | P5 | |||||||
| Diagnostics Division | ||||||||||
| Common Port Plug Engineering Sub-Section | ||||||||||
| Ex-Vessel Diagnostics Section | ||||||||||
| In-Vessel Diagnostics Section | ||||||||||
| Heating & Current Drive Division | ||||||||||
| Electron Cyclotron Section | ||||||||||
| Ion Cyclotron & Lower Hybrid (IC & LH) Section | CHD-058 | Instrumentation & Control Technician | G4 | |||||||
| Neutral Beam Section | CHD-013 | Neutral Beam Section Leader | P5 | |||||||
| PCA | Directorate for Project Control & Assembly | |||||||||
| Assembly & Operations Division | ||||||||||
| Machine Assembly & Installation Section | CIE-214 | Mechanical & Piping Installation Engineer | P4 | |||||||
| CIE-235 | Hi-Tech Systems Installation Engineer | P4 | ||||||||
| Commissioning & Operations Section | ||||||||||
| Project Controls Division | ||||||||||
| Project Control Monitoring Section | ||||||||||
| Project Schedule Management Section | ||||||||||
| SEG | System Engineering Group | |||||||||
| TKM | Directorate for Tokamak | |||||||||
| Magnet Division | TKM-003 | Magnet Division Head | D1 | |||||||
| TF Coil Section | ||||||||||
| PF Coil Section | TKM-057 | Technical Assistant | G4 | |||||||
| CS & Correction Coil Section | ||||||||||
| Superconductor Systems & Auxiliaries Section | TKM-134 | Magnet Auxiliaries Structural Specialist | G5 | |||||||
| Vessel Division | ||||||||||
| VV/Ports & Thermal Shield Section | ||||||||||
| Cryostat & VVPSS Section | ||||||||||
| Internal Components Division | ||||||||||
| Blanket Section | TKM-062 | Blanket Engineer | G6 | |||||||
| Tungsten Divertor Section | ||||||||||
| Tokamak Integration Section | ||||||||||
| PSE | Directorate for Plant System Engineering | |||||||||
| Plant Engineering Division | ||||||||||
| Cooling Water System Section | CEP-010 | Cooling Water Chemistry Engineer | P3 | |||||||
| TCWS-008 / TCWS-010 | Stress Analysis Specialist | G5 | ||||||||
| TCWS-016 / TCWS-017 / TCWS-018 | 3D CAD Engineer | G4 | ||||||||
| TCWS-005 / TCWS-006 | Nuclear Pressure Equipment System Engineer | P2 | ||||||||
| TCWS-007 / TCWS-024 | Thermal Hydraulic System Engineer | P1 | ||||||||
| TCWS-014 / TCWS-015 / TCWS-025 | 2D CAD Technician | G3 | ||||||||
| TCWS-019 | Instrumentation & Control Engineer | P1 | ||||||||
| TCWS-009 / TCWS-011 | Process & System Engineer | P2 | ||||||||
| TCWS-020 | Scheduler | G3 | ||||||||
| TCWS-022 | Manufacturing Engineer | P1 | ||||||||
| TCWS-024 | Thermal Hydraulic Engineer | G5 | ||||||||
| TCWS-026 | Nuclear Engineer | P2 | ||||||||
| TCWS-027 | Project Analyst | G5 | ||||||||
| Cryogenic System Section | ||||||||||
| Radioactive Materials Engineering Section | ||||||||||
| Maintenance & Remote Handling Section | PSE-312 | Maintenance Engineer | P3 | |||||||
| PSE-313 | Maintenance Process Specialist | G5 | ||||||||
| Fuel Cycle Engineering Division | ||||||||||
| Tritium Plant Section | ||||||||||
| Fuelling & Wall Conditioning Section | ||||||||||
| Vacuum Section | CEP-021 | Vacuum Engineer | G6 | |||||||
| Electrical Engineering Division | ||||||||||
| Coil Power Supply Section | ||||||||||
| Electrical Power Distribution Section | PSE-105 | Cable Database Technician | G4 | |||||||
| PSE-080 | Electrical Engineer | P4 | ||||||||
| PSE-387 | Electrical Engineer | P4 | ||||||||
| CEP-093 | Electrical Technician | G4 | ||||||||
| CAD Core Team | PSE-375 to PSE-384 | CAD Designer | G4 or G5 | |||||||
| PSE-331 to PSE-374 | CAD Technician | G2 or G3 | ||||||||
| System Engineers Core Team | PSE-141 | Fuelling System Engineer | P3 | |||||||
| PSE-142 | Detritiation System I&C Engineer | P1 | ||||||||
| PSE-143 | Tritium Confinement System Engineer | P3 | ||||||||
| PSE-146 | Cryogenic Distribution System Engineer | G6 | ||||||||
| PSE-154 | Cryogenic Cold Sinks System Engineer | P3 | ||||||||
| PSE-155 | Electrical Power Distribution System Engineer | P2 | ||||||||
| PSE-156 | Coil Power Supply System Engineer | P2 | ||||||||
| PSE-157 | HVAC System Engineer | P2 | ||||||||
| PSE-157 & PSE-159 | HVAC System Engineer | P2 | ||||||||
| PSE-158 | Cryogenic System Engineer | P2 | ||||||||
| PSE-158 | Tritium Plant System Engineer | P3 | ||||||||
| PSE-160 | Tritium Plant System Engineer | P3 | ||||||||
| PSE-161 | Coil Power Supply System Engineer | P1 | ||||||||
| PSE-162 | Fuel Cycle System Engineer | P1 | ||||||||
| PSE-163 | Water Cold Sinks System Engineer | P3 | ||||||||
| PSE-164 | Vacuum System Engineer | P2 | ||||||||
| PSE-165 | Vacuum System Engineer | P2 | ||||||||
| CAD & Design Coordination Division | ||||||||||
| Mechanical Design & CAD Infrastructure Section | PSE-310 | CAD Applications & Administration Engineer | P2 | |||||||
| Plant Design Section | PSE-263 | Process & Software Engineer | G6 | |||||||
| Project Engineering & Integration Division | PSE-385 | Project Eng. & Integration Division Head | D1 | |||||||
| Design Integration Section | ||||||||||
| Systems Engineering, Analysis & Standards Section | ||||||||||
| BSI | Directorate for Buildings & Site Infrastructure | |||||||||
| Building Systems Section | ||||||||||
| Site Management & Logistics Section | ||||||||||
| Nuclear Buildings Section | BSI-057 | Logistics Storage & Materials Engineer | P3 | |||||||
| Non Nuclear Buildings Section | ||||||||||